The Factory

Built in 8000 m2, click our Trangsan Warehouse is divided into 8 (eight) different areas based on its function and chronological step of furniture being processed. Viewing Trangsan Warehouse from the front view, treatment there are 3 (three) main front gates made of teak in primitive finished to give special appearance for the first sight. Right gate is only open when doing stuffing for containers; Center gate is at the right side of security post, this gate is always be opened when having guest visits; Left gate is used for materials entrance. Entering the gate, security personnel will take a note and supervise on all visitors, incoming and outgoing goods.

Factory Main Gate

Factory Main Gate

First entering the gate, there seems to have 2 (two) main parts at the left and right side with executive lounge for the Director office at the center. The left side is for entrance for all visitors and incoming materials which are divided into Visitor’s entrance at the left and raw materials area at the right side separated with guardrail, so visitors can directly see the process inside raw materials area. Visitors entrance are straight forward to the back entrance for workers, at the middle of the hallway there is security check as a second checking point for entering Production Department office and guest room. The guest room is provided with hot spot zone and business center.

Moisture Content Check

Moisture Content Check

The furniture process procedure is arranged chronologically by each area. The right side of visitor’s entrance is raw materials area with parking area for materials unloaded from supplier. This room is equipped with leveling area, construction checking area and Moisture Content check area.

Next step in the next room is treatment process in which the workers spray materials with safety chemicals for avoiding bugs and any insect attack. The treatment is sprayed since at the supplier, the materials have been sunk for same treatment of avoiding bugs and insect attack. Then they are dried in sun bathing area to keep them really dry and processed for the next step in Sanding area.

Hand Slap

Hand Slap

The sanding area is completed with supportive machines such as Hand slap, Sanding machine, and tank sander. There have 3 (three) different kinds of sanding machines, those are: triangular shape, big square, and small square. After sanding process, the goods are ready for finishing process. Here the goods are separated by kind of finishing whether using hand stain or spray finish.

Hand Spray

Hand Spray

Finishing area is fitted with Spray booths, spray guns, compressors, axial blower, and exhausted fan. Those equipments are used for more effective, efficient, and safety works. The other important equipment is conveyor which is assembled in 310 meters length with circle position in circuit to oven area for drying process after finishing.

Hardware Fitting

Hardware Fitting

Unloaded from conveyor, the goods are ready for accessories fitting in Hardware and Fitting area. This area is equipped with drill, screw driver, router, hand press, and other carpentry tools for assembling process. When all goods are ready, they are started to be packed.

Packing

Packing

Standard packing is using corrugated wrapped paper and carton box by request. In certain case, standard packing of Opium coffee table and stool set is using carton box. After packed, those goods are put on moveable wooden palette to avoid floor humidity.

Wooden Palette

Wooden Palette

All goods are ready to be loaded into container, in stuffing area in which designed in special lay out for effectiveness and efficiency during stuffing process.

Container Load

Container Load